Company News

News about MEVA as a global company, it’s staff, mission, vision, values and reputation as an innovative company established over 50 years.

Back to top

„Services at the highest level“

The premises used by the MEVA subsidiary in Hungary had become too small. Hence, it has now moved to a new, spacious location in Budapest that has modern equipment and offices. Mihály Botta-Dukát, managing director of MEVA Hungary since...

Simply smart slab formwork

The requirements during slab construction are wide-ranging: in-situ concrete or prefabricated parts, small cellar ceilings up to surfaces with thousands of square metres, slab thicknesses, slab heights, challenging floor plans, compensations, architectural concrete requirements … all these factors mean...

Foldable all-in-one solution MIS

Safety on the construction site is not open to negotiation. The safety system MIS that MEVA will be presenting during bauma offers a new dimension of work safety. Safety system for wall formwork systems and rapid construction progress MIS...

Green electricity from sunlight

Generating renewable energy is a major factor in the Black Forest region in the south-west of Germany. MEVA is increasingly relying on photovoltaic (PV) systems as a clean way to produce ­electricity, as solar power can be produced directly...

“Getting rid of superfluous props”

Building contractor Michael Weißinger became the first VarioMax user when his company deployed MEVA’s new system on a project back in February 2022. The flexible support system for semi-precast slabs has since proved its credentials on numerous other contracts....

Putting an end to delays

July 2022 saw the conclusion of a project by master’s degree students at the Biberach University of Applied Sciences in southern Germany. The project was supported by MEVA as a practice partner, its digitalisation partner BIM² and the startup...

MEVA at bauma 2022

After three-and-a-half years the construction industry is finally meeting up again: bauma 2022 will attract an international audience to Munich from October 24-30. MEVA will also be there and presenting smart products and solutions on 470 m² of exhibition space...

Investing in the future

MEVA modernising with an eye on product quality and sustainability In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been...

Foundation formwork made even simpler

1981 saw MEVA unveil its novel “Alu-Wand + Decke” (“Alu Wall + Slab”) aluminium formwork system that combined unusually low weight with high stability. Now known as “AluFix”, the lightweight, crane-independent formwork has since seen a number of refinements...

Constructing the world’s most complex building

The Museum of the Future in Dubai, United Arab Emirates (UAE) has been dubbed the world’s most complex building, thanks to the unusual vertical torus shape and labyrinthine interiors. Recently completed in 2020, the curved shape presented an enormous...

50 years of MEVA – Pioneer and trendsetter

The young Gerhard Dingler had the right instincts 50 years ago when, seeing his future in construction, he founded DINGLER Baugeräte GmbH & Co. KG. He started off by selling and renting out cranes and other equipment but, by...

Close search and go back to site